NOKIA FACTORY PROJECT - BAC NINH PROVINCE

NOKIA FACTORY PROJECT - BAC NINH PROVINCE

NOKIA FACTORY PROJECT - BAC NINH PROVINCE

NOKIA FACTORY PROJECT - BAC NINH PROVINCE

NOKIA FACTORY PROJECT - BAC NINH PROVINCE
NOKIA FACTORY PROJECT - BAC NINH PROVINCE

368/24/28 Tan Son Nhi Street, Tan Son Nhi Ward, Tan Phu District, Ho Chi Minh City

098 99 88 430

Projects

NOKIA FACTORY PROJECT - BAC NINH PROVINCE

Nokia Factory Project

Toan Cau Pumps suppiled A-C Fire Pumps NFPA 20, UL Listed/ FM

Approved.

Location: Bac Ninh.

Pumps system include:

1 Electrical Fire Pump: Q= 2500 GPM, H = 155 PSI with WEG motor 300 HP

   and Eaton Cutter- Hammer controller.

* 1 Diesel Fire Pump: Q= 2500 GPM, H = 155 PSI with Clarke Diesel Engine,

    Eaton - Cutter Hammer controller.

* 1 Jockey Pumps and Eaton Cutter- Hammer controller